Practitioner: Assess design first. Then test operation: every sampled execution needs evidence and every exception needs remediation.
Control register
| Control | Type | Status |
|---|---|---|
| Detective · Automated | Design effective | |
| Preventative · Automated | Documented | |
| Detective · Manual | Documented | |
| Preventative · Automated | Documented | |
| Detective · Manual | Documented | |
| Detective · Automated | Documented | |
| Preventative · Manual | Documented | |
| Detective · Manual | Documented | |
| Detective · Automated | Documented | |
| Preventative · Manual | Documented |
CTL-001 · Settlement amounts reconcile to the ledger
- Risk addressed
- Merchants paid incorrect amounts
- Related CDE
- Settlement Amount
- Related usage
- Merchant Settlement
- Owner
- Settlement Operations Manager
- Classification
- Detective · Automated
- Frequency
- Daily
- Evidence requirement
- System log or signed checklist
- Last execution
- Day -1
- Design effectiveness
- Effective
- Operating effectiveness
- Not tested
- Remediation
- None
1. Design assessment
2. Operating effectiveness test (separate activity)
Executions
- Day -5: evidence
- Day -4: evidence
- Day -3: evidenceException: 3 breaks above tolerance
- Day -2: evidence
- Day -1: evidence
Attaching synthetic evidence is a simulation. Generated records never prove that a real control operated.
Step 1 of 7
- Risk
- Control
- Execution
- Evidence
- Testing
- Exception
- Remediation
Risk
Merchants paid incorrect amounts